Re: What is in the post? welcome to GWA: gear whores anonymo
Posted: Sun Jun 24, 2018 9:47 pm
ILF4LYF
https://ns2.ilovefuzz.com/
Hopefully he actually ships pedals. 3 week build time is turning into 6 weeks and counting for my Dungeon Master.Jero wrote:I saw idiotbox is having a 25% off sale todayck3 wrote:I picked up the EHX B9 from a local post office earlier today and will be taking it for a brief test drive shortly. Also, Idiotbox has completed and mailed preordered V2 Dungeonmasters, and I Just added Foxrox Brown Muff and Red Octave ZIM cards to the pile. A hung day, or whatever the young folks around here call it is imminent.
Good to see it arrived!comesect2.0 wrote:
My V2 Dungeonmaster shipped shortly after sending an email inquiry regarding order status. I thought the remainder of the batch was also nearing completion based on Matt's reply. He seems pretty responsive to emails, though my Black Friday Han-taun also took longer than the original estimate to ship. Still, the build time hasn't been too bad for what I assume is a small (if not one man) operation. Plus, the ILF tourbox he previously sponsored was loads of fun.nogodsnobedtimes wrote:Hopefully he actually ships pedals. 3 week build time is turning into 6 weeks and counting for my Dungeon Master.Jero wrote:I saw idiotbox is having a 25% off sale todayck3 wrote:I picked up the EHX B9 from a local post office earlier today and will be taking it for a brief test drive shortly. Also, Idiotbox has completed and mailed preordered V2 Dungeonmasters, and I Just added Foxrox Brown Muff and Red Octave ZIM cards to the pile. A hung day, or whatever the young folks around here call it is imminent.
Yeah, I'm not mad, just impatient is allck3 wrote:My V2 Dungeonmaster shipped shortly after sending an email inquiry regarding order status. I thought the remainder of the batch was also nearing completion based on Matt's reply. He seems pretty responsive to emails, though my Black Friday Han-taun also took longer than the original estimate to ship. Still, the build time hasn't been too bad for what I assume is a small (if not one man) operation. Plus, the ILF tourbox he previously sponsored was loads of fun.nogodsnobedtimes wrote:Hopefully he actually ships pedals. 3 week build time is turning into 6 weeks and counting for my Dungeon Master.Jero wrote:I saw idiotbox is having a 25% off sale todayck3 wrote:I picked up the EHX B9 from a local post office earlier today and will be taking it for a brief test drive shortly. Also, Idiotbox has completed and mailed preordered V2 Dungeonmasters, and I Just added Foxrox Brown Muff and Red Octave ZIM cards to the pile. A hung day, or whatever the young folks around here call it is imminent.
SciFi bookclub sounds like blast!daedelus23 wrote:Postman has an Industrialectric RM-1N from our own raj007 for me today. Gotta go to work and then SciFi bookclub afterwards so I won't be home until late
It's a lot of fun. Most everyone else is way more informed than I am so I usually end up with a list if three or four classic books I should really read. This month's book was a bit of a dud though ("Free Live Free" by Gene Wolfe)Jero wrote:SciFi bookclub sounds like blast!daedelus23 wrote:Postman has an Industrialectric RM-1N from our own raj007 for me today. Gotta go to work and then SciFi bookclub afterwards so I won't be home until late
[youtube]http://www.youtube.com/watch?v=a4MPBJdQmOw[/youtube]lost in music wrote:I'd like to visit Kamloops though. It looks quite lovely and has a ridiculous name.